![]() Rep Rows 3 and 4 five more times until all heel sts have been worked. Row 4: Sl 1, p to last st before gap, p2tog, p 1, turn. Row 3: Sl 1, k to last st before gap, ssk, k 1, turn. Sts are redistributed as follows: 32 sts for heel flap, 2 x 17 sts for instep. ![]() Also slide all 11 sts from needle 1 and 5 sts from needle 2 onto needle 4. Needle 3: work Rnd 4 of Chart A until 5 sts rem, slide those rem 5 sts onto left needle (needle 4). Next rnd: Work needles 1 and 2 in established pattern (rnd 4) of Charts D and A. The stitch pattern needs to be adjusted because it is no longer in the middle of a needle. Note: It is normal that the placement of yarn overs changes on the first rnd of Chart D. When finished with Chart C you have 11 sts each on needles 1 and 4 and 22 sts each on needles 2 and 3.Ĭont in patt as est, working needle 1 and 4 from Chart D and needle 2 and 3 from Chart A until desired length before heel flap (about 2 ½ inches before bottom of heel), ending with Rnd 3. When finished with Chart B move on to chart C for further decreases. Work from chart B for needle 1 and 4, continue working needle 2 and 3 (2 x 22 sts) from chart A. Twice on each needle (8 times total) knit those 2 sts individually in order to increase by 8 sts 88 sts (22 per needle) With knitting needle and starting 2 or 3 sts from the last chain of the crochet chain, pick up 76 sts by knitting into the bumps behind each chain st, CO 4 sts using the backward loop method without the crochet chain 80 stsĭivide evenly between 4 needles and join into round being careful not to twist.įolding cast on edge to the inside, carefully undo the provisional cast on and knit 1 st of the cast on round together with 1 st on the needle (the last 4 sts on needle 4 are worked alone to leave a space for weaving in elastic). With waste yarn and crochet hook, work a chain of at least 80 sts. They start with a provisional crochet cast on, the hem is folded in half to allow an elastic band to be slipped through (this is the best way I found to assure my knee highs stay up). These socks are worked from the cuff down. Please see our standard list of abbreviations. NotionsĬrochet hook US C/2 or D/3 (2.5 or 3.25 mm), waste yarn, tapestry needle, 1 yard of ¾” elastic Abbreviations 32 sts and 48 rows = 4” in st st and slightly stretched lace pattern.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |